- 2026-11-23 05:23:11
- Singhania Refrigeration
- Logistic
Cold Storage Project Report (DPR): Contents, Format & Preparation Guide
A project report on cold storage is the determinant of a bank's financing decision and approval of a scheme for subsidies. Unsatisfactory reports fail for obvious reasons such as tools shown in the project being impractical, a generic technical section or mismatch of cost heads with quotations.
This guide highlights the contents of a detailed project report (DPR) on cold storage in various sections consisting of technical and financial parameters sought by the reviewers. It makes use of the DPR model template for cold storage provided by the NHB, NABARD's model bankable project report format and normal appraisal ratios used by banks.
What is a DPR for cold storage
A DPR is a perfectly structured project proposal that covers everything about the project: who the contractor is, where the project will be conducted, what is the size of the budget, what technology will be used, and the loan repayment conditions.
- The lenders verify the ability of the borrower to repay, collateral and the commitment of the promoter.
- The authorities of the concerned scheme (NHB or a state horticulture mission, and the banks for AIF loans) verify the eligibility and cost and technical parameters of the project.
- The promoter checks the feasibility of implementing the project before investing.
It is expected of applicants to sign every page of the NHB template, and in some instances, the page has to be signed by horticulture and project financing experts as well. Besides that, some declarations are required from experts such as cold storage specialists, a mechanical engineer, a horticultural expert, a post-harvest technology expert, and a chartered engineer responsible for civil works and plant and machinery. Furthermore, a chartered accountant has to confirm the financials of the project. Thus, it can be concluded that a bankable project report is the result of teamwork while technical sections require more engineering knowledge rather than just inserting data into the DPR template.
Key sections of a cold storage project report
The structure of NHB's model can be seen below, which is also accepted by many banks. NABARD's model bankable projects are basically the same as its model which includes items such as unit cost of the project, bank loan and margin money, techno-economic parameters, income and expenditure, and financial analysis (BCR, NPV, IRR) along with the repayment schedule.
| Section |
What it covers |
Evidence to attach |
| Project at a glance | Applicant, site, capacity, chambers, cost, finance, key ratios | Summary sheet signed on every page |
| Promoter profile | Constitution, experience, registrations, benefits availed earlier | PAN, GST, incorporation papers, MoA, board resolution, CVs |
| Project description and site | Rationale, layout, connectivity to catchment and mandis | Land records or registered lease, layout plan, location map |
| Market viability | Commodities, catchment, production, existing capacity, supply gap | Horticulture department data, APMC price series, list of nearby cold stores |
| Business model | Rental, own trading or a mix; commodity and season plan | Letters of intent or MoUs, if any |
| Technical viability | Chambers, insulation, refrigeration, heat load, protocols, automation | Drawings, heat-load sheets, equipment data sheets |
| Financial viability | Cost, finance, projections, ratios, sensitivity | Quotations, CA declaration, due-diligence checks |
| Food safety and traceability | GMP and HACCP, SOPs, licences, batch tracking | FSSAI licence and other statutory approvals |
| Risks and SWOT | Power failure, price swings, pests, fire, technical failure | Mitigation plan, insurance |
| Implementation schedule | Land to commercial operation; NHB allows 18 months | Month-wise plan |
Two market-section regulations trap many novice applicants. NHB's template restricts the catchment area to a maximum of 100 km radius from the place of production while requiring deducting the quantity of production consumed freshly before comparing the marketable surplus to the available cold storage capacity. The template uses 30% as the example but allows you to choose your own number with proper justification. The resultant figure is the basis for your capacity justification. To see the building sequence of the plant after the approval, follow our cold storage plant construction guide.
Technical specifications section
This is the area where generic reporting experts falter. NHB Type-1 Data Sheet wants design information for evaluation to be incorporated for tier 1 rooms above the weight of 250 MT. The parameters are in place for potato storage and do not represent other products, like food products may need ASHRAE standards and their own protocol.
| Area |
Parameter |
NHB reference value |
| Chamber sizing | Capacity and limits | Chamber volume ÷ 3.4 m³ per MT; 50 kg bags (20 per MT); height up to 15 m; at least 4 platforms per chamber |
| Covered areas | Handling, ante room, machine room | Height of at least 4.6 m; admin block at least 3.6 m |
| Insulation, PUF option | Thickness and density | 100 mm walls and ceiling, 50 mm partitions, 100 mm floor in two layers; 40 ± 2 kg/m³; k 0.023 W/mK |
| Insulation, EPS option | Thickness and density | 150 mm walls and ceiling in two layers, 125 mm floor; 16 ± 2 kg/m³; k 0.036 W/mK |
| Doors | Per chamber | One door, at least 1 m × 2 m, 100 mm PUF, strip curtain with 25% overlap |
| Heat load inputs | Loading and pull-down | 20–25 days at 4–5% of capacity per day; product up to 25°C; to 15°C in 24 hours, then 2–3°C per week or 0.5°C per day |
| Air and ventilation | Airflow and fresh air | 85 CMH per MT in loading and pull-down, at least 50 CMH per MT in holding; 6, 4 and 2 air changes per day (loading, pull-down, holding); CO₂ 2,000–4,000 ppm; energy recovery of at least 70% |
| Refrigeration | System design | Ammonia; three compressors of 50% each (two working, one standby); +2°C evaporating in loading, −2°C in holding; condensing 38/40°C |
| Evaporators | Coil and fan | SS-304 tube, aluminium fin, fin spacing 6.25–8.5 mm, VFD fan control |
| Operating limits | Hours and efficiency | Compressors up to 20 h/day; defrost up to 2 h/day; COP above 3.5 at peak and 3.2 in holding |
| Safety and control | Monitoring | Ammonia sensors, emergency ventilation, PLC with data logger, standby DG set |
Source: NHB DPR model template, Type-1 cold storage data sheet. Confirm against the latest NHB guidelines before submission.
The section requires submission of attachments: a plant layout from a licensed architect, heat-load calculations (in SI units) from a qualified engineer, and sheets from the equipment manufacturers. Compliance with the relevant IS codes (IS 661 for insulation methodology, IS 4671 for EPS, IS 12436 for PUF), as well as the NHB-CS-Type 01-2010 standards and minimal system standards published by the Ministry of Agriculture in May 2015 is expected from the NHB.
Financial projections and assumptions
According to NHB's template for preparation of financial model, costs associated with the project may be broken down to include costs as incurred for land and land development projects, technical building (civil work, pre-engineered structure, insulation, racking, fire fighting), non-technical building, plant and machinery, power and utilities, miscellaneous fixed assets, pre-operative expenses etc. Each section should be assigned a cost. The template also requires you to provide your proposed costs as against the per MT costs prescribed by NHB. According to the guidelines issued by NHB, Type 1 is specified at ₹8,000 per MT for up to five thousand MT of material. Therefore, make sure to check the cost as required.
The Means of Finance template has three components: the promoter's contribution, the term loan from banks and loans that are not secured. The subsidy given under NHB and MIDH is attributed to being credit-linked and back-ended at a rate of 35% in the areas in question and 50% of the total cost of the project in North-eastern, hilly and scheduled areas, as long as the work is completed. The Agriculture Infrastructure Fund provides collateral-free term loans which are capped at ₹2 crore but have interest subvention of 3%.
| Block |
Line items |
Assumption to state |
| Revenue | Capacity × utilisation × rent per MT per season; other income | Local rental rates; utilisation ramp over the first years |
| Operating cost | Power and fuel, labour, loading and unloading, repairs, insurance, administration, selling, weight loss | Tariff, wage rates, per-kg cost for one season |
| Profit | Operating profit, depreciation, interest, tax, profit after tax | Depreciation method and loan rate |
| Debt | Term loan, moratorium, repayment schedule, subsidy adjustment | Tenor and bank terms |
| Balance sheet | Net worth, working capital, debt-equity, TOL/TNW | Working capital cycle |
| Cash flow | Net cash flow, DSCR, break-even, IRR, BCR | Projected over Y1 to Y8, as in the template |
Illustrative layout of the projection section, following NHB's Y1–Y8 format. Figures come from your own quotations and market data.
The banks then compared the projections with the benchmarks. The benchmarks as per NHB Template are indicative and applicable to each bank.
| Ratio |
NHB template benchmark |
What it tests |
| DSCR | 1.5 : 1 | Ability to service the loan from cash flow |
| Debt-equity ratio | 3 : 1 | Leverage |
| TOL/TNW | 4 : 1 | Total liabilities against net worth |
| Current ratio | 1.25 : 1 (1.10 : 1 for export units) | Short-term liquidity |
| Promoter's contribution | 25% minimum | Commitment |
| Security coverage | Above 100% of loan | Collateral cover |
| Repayment period | Up to 7 years excluding moratorium, overall tenor within 10 years | Loan structure |
Then, sensitivity analysis must be performed. The Template outlines three scenarios: decrease in capacity utilization by 10%, decrease in sales by 10% and increase in raw material price by 10% and DSCR has to be calculated with respect to each of these scenarios. It will be much easier to sanction DPR if in all three scenarios it stays above the threshold set by the bank.
Note: these benchmarks and scheme terms change. This guide is general information, not financial or legal advice. Confirm current norms with your lender and the latest NHB guidelines.
Common mistakes in DPR preparation
- Flat, optimistic utilisation. According to the projection of complete occupancy in the first year, sensitivity fails. A combination of ramp and seasonal volume will help build the holding and sales calendar.
- An unproven catchment. By disregarding the fresh-consumption deduction and the existing-capacity gap, one tends to overestimate demand.
- A generic technical section. The potato parameter is incorporated into a multi-commodity store without consideration of ethylene reaction, smell, and temperature compatibility in relation to other goods involved.
- Costs that do not match quotations. The reviewers are comparing the various heads presented with supplier quotations and cost norms.
- Name mismatches. According to NHB, the applicant's name needs to match throughout the application process i.e. in the application, sanction etc. If there is any discrepancy, the application will be rejected.
- Weak land title. The template states that the land should be owned or registered with a minimum period of lease of 10 years and ideally 11.
- Ignoring utilities. Power consumption, backup generation, and water require clear sources and backup systems.
- Missing certificates. When some pages are not signed and the engineer's or construction accountant's statements are not available, it delays the valuation.
- An unrealistic schedule. The NHB's time limit for completion of a project is 18 months. Plan the purchase of materials and physical work around this time.
FAQs
What should a cold storage project report include?
At a minimum: promoter profile, site and land documents, market and catchment analyses, business model; technical design with heat load calculations; project cost with quotations; means of finance; projections for five to eight years with DSCR; IRR; sensitivity analysis; food safety and licenses; and risk plan. NHB's template is also for expert opinions with respect to technical and financial sections.
How to prepare a DPR for a bank loan?
Correct the location and real estate title first, and then gather quotes from the suppliers after getting the layout approved and heat load calculated by an engineer. Use those figures to create a financial model. Use those figures to prepare contact calculations and check them against the bank norms. Send the certificates for signing and give a draft to the bank early enough, because banks need time to prepare their own due diligence, including credit checks and black list checks.
What is the cost of DPR preparation?
No fixed price has been set. The charge is based on the size of the project being undertaken, whether one is seeking assistance from NHB or AIF, or taking a plain bank loan and how many technical details, such as drawings, heat load calculations, and engineer and CA declarations have to be made to comply with NHB's requirements. It is advisable that one asks for an itemized report and refrain from utilizing an inexpensive report that has been created from a template.
Can one DPR serve both a bank loan and a subsidy application?
Yes, the template used by the NHB is intended to allow its report to be used for both the purpose of the bank's market and financial appraisal, as well as for the technical review conducted by NHB. The bank only determines whether the project is viable, while NHB takes care of the technical aspect of this evaluation.
How long does the approval process take?
The NHB's procedure estimates around one month for the technical feasibility phase, and the bank appraisal might take as many as six months before issuing a sanction. The total completion time for the project is stated as a maximum of 18 months. The NHB suggests filing the application far in advance of the planned start date, ideally six months.
What DSCR do banks expect for cold storage?
NHB's format reflects a tendency of 1: 1.5 and a debt equity ratio of 1: 3 along with a promoter contribution of 25%. In this respect, it is important to note that timelines may differ from one bank to another, and therefore you should confirm your numbers before completing the financial model.
Do I need to own the land?
No need. The template can accept land that is owned or someone proper lease for at least 10 effective years from the date of in-principle approval. Add one year for processing purposes. The land must be in the name of an applicant with the title and borders.
Conclusion
The feasibility study for cold storage is successful when the technical designs align with the findings of the market study and the numbers in the financial forecasting. Before submitting, consider the following checklist:
- Market: the surrounding demand area covers at least 100 km, there is a deduction for marketable and perishable foodstuffs, and at least one supply shortfall is established.
- Technical: all the storages include volume rating, insulation performance, and cooling load values, which comply with average reference data obtained from engineers.
- Financial: costs tied to quotations, DSCR of about 1.5 or better, and all three sensitivity cases passing.
- Compliance: clear land title, matching names across documents, licences, and signed certificates on every page.
- Schedule: a plan that completes within 18 months.
Get these five right and the DPR reads as a bankable project rather than a template, which is what lenders and scheme reviewers are looking for.
Need a bankable DPR? Singhania Refrigeration's consulting team supports project reports with engineered layouts, heat-load calculations and cost estimates that stand up to appraisal.
Get professional DPR preparation support →
References: National Horticulture Board, DPR Model Template for NHB Scheme No. 2 (cold storage), nhb.gov.in, and NHB scheme guidelines and cost norms, nhb.gov.in; NABARD model bankable project format; Government of India parliamentary replies on MIDH and the Agriculture Infrastructure Fund; PIB release on PMKSY and AIF, November 2025.